Rubber is used in a vast number of products, from tyres on vehicles to disposable surgical gloves. Increasingly both manufacturers and legislators are realising that recycling is essential for environmental sustainability and can improve the cost of manufacture. The volume of rubber waste produced globally makes it difficult to manage as accumulated waste rubber, especially in the form of tyres, can pose a significant fire risk. Recycling rubber not only prevents this problem but can produce new materials with desirable properties that virgin rubbers lack.
This book presents an up-to-date overview of the fundamental and applied aspects of renewability and recyclability of rubber materials, emphasising existing recycling technologies with significant potential for future applications along with a detailed outline of new technology based processing of rubber to reuse and recycle. This book will be of interest to researchers in both academia and industry as well as postgraduate students working in polymer chemistry, materials processing, materials science and engineering.
- ISBN:
- 9781788010849
- 9781788010849
-
Category:
- Rubber technology
- Format:
- Hardback
- Publication Date:
-
11-09-2018
- Publisher:
- Royal Society of Chemistry
- Country of origin:
- United Kingdom
- Pages:
- 337
- Dimensions (mm):
- 234x156x23mm
- Weight:
- 0.68kg
This title is in stock with our overseas supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.
Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.
Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:
ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days
Share This Book: