Free shipping on orders over $99
The 2011 Fukushima Daiichi Nuclear Power Plant Accident

The 2011 Fukushima Daiichi Nuclear Power Plant Accident

An Analysis from the Metre to the Nanometre Scale

by Peter George Martin
Hardback
Publication Date: 27/07/2019

Share This Book:

  $259.01
or 4 easy payments of $64.75 with
afterpay
This item qualifies your order for FREE DELIVERY
This PhD sought to determine the mechanisms for the reactor explosions by mapping, collecting and analysing samples from across the area of Japan that received radioactive fallout from the explosions. In doing this, the author conducted significant fieldwork in the restricted-access fallout zone using ground and novel UAV-based mapping of radiation to identify hot-spot areas for sample collecting but also using these tools to verify the efficacy of the clean-up operations ongoing in the prefecture. Such fieldwork was both technically pioneering for its use of UAVs (drones) but also selfless in terms of bravely entering a nuclear danger area to collect samples for the greater benefit of the scientific community.
ISBN:
9783030171902
9783030171902
Category:
Atomic & molecular physics
Format:
Hardback
Publication Date:
27-07-2019
Publisher:
Springer Nature Switzerland AG
Country of origin:
Switzerland
Pages:
326
Dimensions (mm):
235x155mm
Weight:
0.7kg

This title is in stock with our Australian supplier and should arrive at our Sydney warehouse within 2 - 3 weeks of you placing an order.

Once received into our warehouse we will despatch it to you with a Shipping Notification which includes online tracking.

Please check the estimated delivery times below for your region, for after your order is despatched from our warehouse:

ACT Metro: 2 working days
NSW Metro: 2 working days
NSW Rural: 2-3 working days
NSW Remote: 2-5 working days
NT Metro: 3-6 working days
NT Remote: 4-10 working days
QLD Metro: 2-4 working days
QLD Rural: 2-5 working days
QLD Remote: 2-7 working days
SA Metro: 2-5 working days
SA Rural: 3-6 working days
SA Remote: 3-7 working days
TAS Metro: 3-6 working days
TAS Rural: 3-6 working days
VIC Metro: 2-3 working days
VIC Rural: 2-4 working days
VIC Remote: 2-5 working days
WA Metro: 3-6 working days
WA Rural: 4-8 working days
WA Remote: 4-12 working days

Reviews

Be the first to review The 2011 Fukushima Daiichi Nuclear Power Plant Accident.